Sunday, October 11, 2009

Laying of concrete-Kerala practices

Having worked with many workers in different work sites in Kerala,I can tell you one fact which is common among all these workers.They give only lip service to quality of work.
When you ask them about quality of work,all of them tell that they are not like others and they do the work in the correct manner irrespective of supervision or lack of supervision.But this is  just a  hollow promise,without any intension of following it up with action.In reality they will do only that which has less physical strain and they will try to make the owner of building believe that what they are doing is the correct manner of doing work.
While laying concrete usual follies or mistakes done by workers are the following
1.They add more water to the concrete so that it is easier for them to level the concrete or compact it in case of beams and columns even though more water in excess of allowed quantity will reduce strength of concrete.
2.They reduce quantity of coarse aggregates(3/4 inch metal if I use usual terminology) so that it will be easy for compaction especially when compaction is done manually without use of vibrator.They increase quantity of fine aggregates like river sand,again for less physical strain in mixing and compacting.
3.Cement quantity will be reduced only if material supply is also being arranged by the contractor.Otherwise cement will not be reduced as it is not affecting physical strain of concrete mixing and laying.
4.For beams and columns they talk as if concrete with more water is essential.After hearing it for some time any one will start thinking that columns and beams require concrete with more water.
As majority of houses and other buildings in Kerala are being constructed without professional guidance and supervision,there is also absolutely no structural design by a qualified Engineer forconcrete parts of these buildings.
Workers will lay steel as they feel comfortable so that steel tying and fixing can be the minimum possible to reduce steel work.
DSC00083
DSC00086
DSC01110
DSC00087
DSC00093
I will tell you about two events among my varied experiences in dealing with unrelenting work force in concrete work.
We were laying concrete somewhere near Angamaly for a convent building.Suddenly mother superior of that convent wanted me to meet her.I went and met her
“Why are you concreting without sufficient water in concrete?”She asked.In fact I literally had to fight with unrelenting workers to reduce water in concrete to desired level and now this lady is finding fault with me for that.See how these workers have misinformed general public to believe that the follies narrated by them are correct.
At Ranny at the time of first roof slab concreting my client has called a few of the local contractors of building work who were quite unhappy for not getting work of this house as my client has chosen to get me for the work from far away Cochin.He called them to be present at the time of concrete to check whether the Engineer from Cochin and his workers are doing the concrete properly.After the tea within half an hour of commencement of concrete laying all of them left the place saying that ” now he will do it correctly as we have come”
I asked my client-“What do they say about steel reinforcement work for roof concrete?”
He replied-“They say that you have put steel for four houses in this roof”
DSC00126
DSC00190
DSC00413
DSC00557
DSC01431[1]
I have put steel only sufficient and essential for the work.Of course this sufficient and essential is four times according to worker as more steel means more work for him.As the work is taken up on square feet rate basis more steel work means lesser profit for him as the labour wages will increase due to more steel work.

Who is bothered about structural stability of the house?The concreted roof should not fall down immediately after removal of supports after curing period.Whatever happens later,the worker will not be around to face it.Even if he is locally available,he will wash his hands saying “You gave the work to me knowing very well that I am not an engineer?If you were so particular about stability of the house,you should have engaged an Engineer for the work”
At the time of negotiating to get contract for the building if you ask him “Should we not go for an Engineer to design and supervise the work?”
He will reply like this-“Why you have to waste money on an Engineer?I have built hundreds of houses without any Engineer.Nothing happened to any of the buildings.If you have more money to waste,get an Engineer'”
Concrete mixing practices are different in different parts of Kerala.
In Nilambur they use a sloping wooden case where they keep cement and aggregates at top side and as these are brought down mixed with water using hand tools,concrete mixed is received at end of sloping wooden case
At Alwaye they  use long spade to mix concrete.This make movement of spade and mixing easier.
At Cochin and many other places there is a bad habit of dumping aggregates one above other and trying to pour water and mixing whatever is available at one end.This practice prevents proper mixing of concrete.But here again who bothers?
Worker will vouch vehemently to the owner who does not know anything about concrete mixing that what he does is the correct and most appropriate method
Many people think that by using a manually operated mixer machine concrete is mixed properly.First of all workers will not put aggregates in proper proportion to reduce their strain in levelling and compacting concrete.Secondly the operator of mixer machine will not turn it sufficiently for proper mixing as he want the work to be over faster ,mixing or no mixing.
DSC01795
DSC01796
DSC02320
DSC02328
The best way out in recent time available in major towns like Cochin are ready mix concrete.As the mixing and laying is done mostly by machine without much man power involvement,worker introduced excuses for low quality work will not come into play.Only precaution required is that ready mix supplier should be given instructions about quantity of water as they will again try to increase water content for easier pumping of concrete.
Vibrator is the best option for proper compaction of concrete after laying on roof or beams.The old method of using hand compaction with steel bars is likely to be affected by worker laziness and fatigue.
Another advantage of using ready mix concreting is that you can avoid too many workers running around roof to be concreted with all sorts of confusion and shouting at the time of concreting.In some places there is a practice of giving continuous run of  food and drink to these concrete workers including liquor to make them happy  for doing a lousy  irresponsible job for concreting roof of your house to be built only once in your life time
Another important aspect to be noted is curing required after concrete laying.Many worker turned contractors will advise house owner that spraying water once or twice is sufficient  again to reduce his labour charges.
Concrete laid will have to be kept under water for minimum two weeks.In case of slope roof,jute bags will have to be kept above slope roof with frequent spraying of water on it to keep concrete surface wet and cool.
DSC00101
DSC02714

Thursday, October 8, 2009

Our Blogs on Kerala Architecture, House construction, interior design, Kerala life, travel and politics

Completed works

http://kerala-houseconstruction-irinjalakuda.blogspot.com/

http://kerala-houseconstruction-cochin.blogspot.com/

Work in progress

http://kerala-houseconstruction-vyttila.blogspot.com/

http://kerala-houseconstruction-nilambur.blogspot.com/

http://kerala-houseconstruction-sunny.blogspot.com/

http://kerala-houseconstruction-cherthala.blogspot.com/

http://kerala-houseconstruction-elamakkara.blogspot.com/

http://tamilnadu-houseconstruction-ootty.blogspot.com/

http://kerala-houseconstruction-chengannur.blogspot.com/

http://keralahouseconstruction-koratty.blogspot.com/

Blog and Knoll on Kerala Architecture

http://viruvelil.blogspot.com/

http://knol.google.com/k/thomas-viruvelil/kerala-architecture/

http://kerala-architects.blogspot.com/

Blog on Kerala life, Politics, travel and on Kerala Architecture

http://kerala-life.blogspot.com/

http://kerala-present-trends.blogspot.com/

DISCLAIMER

Every effort is taken to provide you authentic information on Kerala Architecture and it is features and other relevant information on building a house in Kerala. VIRUVELIL group of Companies or V.H.Thomas or any person interacting through this website on behalf of VIRUVELIL group of companies will not be responsible for the authenticity or correctness of the information provided through this website or conveyed by email to any person contacting us for information, assistance, guidance or for any commercial activity related or followed after any enquiry or request for services /assistance/guidance

We do not accept responsibility for loss or damage arising from the use of the information provided through this website which may be creative work/technical data without our consent/involvement and guidance. We have complete, unchallenged copy right for all information, data, pictures, design details provided through this website. Any dissemination, use, review, distribution, printing or copying in part or full of information, data, pictures design details provided through this website is strictly prohibited.

In search of a good Elevation

While dealing with house construction clients in Kerala,it is very common to hear from them that they require very good Elevation or appearance for the house.
Some people even send Elevations of houses they have seen in websites of builders and send it to me saying that I want my house  to look like this.The person who make such demands is not even bothered about plan of that house which may be totally different from his requirement,budget and it may not even fit into his property.Who bothers about all these?
Most of them think that a good Architect is simply some one who can draw impressive Elevation from any plan of the house prepared by any one.Again usual Malayalee expectation of a house to be built is that the house should look impressive from outside.For them an Architect is some one capable of doing this from any plan.So you do not require an architect to draw plan of your house.A lot of people think that if they draw few lines and write whatever measurements they feel like,it will be the best plan for his house.
”After all,how can an Architect draw plan of my house when I am spending my money?.Let him draw a good Elevation for the house preferably one which look like a photo.I should know how the house will look,when completed”
A good elevation is possible only for a good Plan of the house.An Architect has to use the following during preparation of plan of a house.
1. His knowledge.
2.Years of experience in designing and building houses.
3.Structural engineering aspects to reduce construction costs.
4.Modern architectural techniques to enhance utility of every bit of built up space.
5.Ensure proper ventilation and lighting using sunlight in all living spaces.
6.Proper control and protection from sunlight,winds and rain for every living space.
7.Vasthu compliance
8.Reduction of cost by better utilisation of available resources.
9.Plan to obtain good external appearance for the building not only from front side but from every sides of the building.
Additionally for Malayalees,
10.Try to make the house look bigger than what it really is.
I can tell  many stories of experiences in dealing with clients about each of these aspects.But I will tell only two experience detail here.
At Punalur,I met an NRI who has become rich only very recently for design of his house in his existing plot.When I reached from Cochin with prior fixing of time,I had to wait at his rented accommodation for nearly an hour for the simple reason that my novae rich client wanted to make me wait for making me feel his “greatness” in front of me.
Before even proceeding to see the plot,he opened his laptop and showed me house pictures taken from websites of villa builders.
“I want house like this”
I said Okay.When I reached the plot ,the plot has only more cents which is only area of the land.It has very little width and the picture he showed simply will not fit into that plot.Even though I tried to prepare plan suited to that plot and his requirements,he was adamant that the plan does not suit with the plan he showed me.What will I do and how will I make him understand the fact?
At Irinjalakuda when I went to design and build a house father of my client had one simple demand.
House should look bigger than the new house of a film star nearby even though he cannot have 6500 sft plinth area of house of film star.He cannot go beyond 4000 sft.With 4000 sft.I designed and built house looking bigger than that 6500 sft house of neighbour.
Plan of the house is the most important, most valuable drawing of your house.Try to get the best talented Architect for preparation of that unique plan specifically suited to your plot,requirements and budget.A good plan will naturally give you a good elevation.But give the Architect time to dream and visualise a good plan and give him more time to develop a good and unique appearance for your house.Do not make him design in a hurry for you.Some times he may need more time to dream well for you.

Saturday, October 3, 2009

Harthal and holiday culture

We Indians are quite famous for laziness and finding excuses in not doing work properly with quality and professional dedication.I am not saying all of us are like that.But a good majority are like that.They not only try every trick to avoid work while duly collecting payment which should have come to a person only after properly doing the work.

Instead simple presence at work place is reason enough to demand wages irrespective of whether the person has done work properly or not.To escape from this habit of collecting wages without justifying the collection of money,we at construction industry try to link wages to output of work.Even then the lazy workers find out ways to escape work by collecting advance payments in excess of proportionate work.

All of us are trained to demand and enjoy holidays for one day or two to commemorate birth or death of past leaders of the nation.Does these great men really wanted our citizens to waste a day or two in memory of them? I do not think so.We have Gandhi jayanthi a national holiday possibly against the message of life of Gandhi.Probably he would have liked citizens of India to work harder with better dedication and sincerity in memory of him on his day of birth.But we think otherwise.We think best way to honour his memory is by idling and wasting time on birth day of Gandhi.

In Kerala we have a funny method of strike previously called as Bundh and now rechristened as Harthal. A few people dictate to others not to work on a day threatening with dire consequences if they dare to.People who value their life and property remain inside closed doors on that day.Having found streets and work places empty these threatening guys go wild with happiness and declare that all those who remained indoors due to fear are their followers or admirers!

These Harthals and meaningless public holidays to commemorate great men of this nation should be stopped without any delay as these bad practices will only make us eligible to be called as barbarians

Wednesday, September 30, 2009

Foundation Rubble work for house construction

At Cochin Foundation work for house construction is generally costly as most of the land in Cochin are marshy land sometimes without even a trace of sand to depths as high as 12 to 15 metres.At Elamakkara where I have built a house of about 3000 sft in 2004 and presently building a house of about 3600 sft,I had to do concrete piling for foundation to depth of about 14.5 M.Similarly at Vyttila,Kathrikkdavu,Karukappilly,I had to do concrete piling.Including after piling works like raising pile columns,Foundation beams,basement brick work,filling plinth etc,Foundation costs in these cases have gone up to about Rs.10 lakhs
At Kaloor,Edappally,Palarivattom,Kalamassery,Kakkanad I could do with less costly rubble foundation as the soil in these places were stable with either abundant sand or laterite.
Rubble foundation traditionally was done in most of the places as rubble  masonry using rubble joined with sand cement mix or mortar with low mix ratio mostly as low as 1:10.Mortar when compared to rubble has low strength even after curing with water whereas the strength or bonding is better when used with brick normally with a mix ratio of 1:8.
My Guru Architect Angelique has taught me to use rubble work in dry pack for foundation as well as for basement.She was trained extensively under renowned Architect Lawrie Baker and thus I inherited all those cost reduction methods on building construction.


As usual I never accept anything unless I am fully convinced about correctness of the method adopted.Procedure followed by her duly followed by me with no change(As I am fully convinced about it)for Foundation work using rubble is detailed below
In a stable soil we do not dig a lot unnecessarily.In southern Kerala there is a widely accepted belief among people that whatever may be the strength of soil,one should dig at least 6 feet down for foundation rubble work for house.After digging 6 feet,mostly very stable soil(sometimes even laterite soil)they put p c c 1:10 in the bottom.

Then the rubble worker will simply throw rubble pieces into the six feet excavated foundation area.By such throwing of rubble,p c c will get damaged fully.nobody bothers.Once rubble filling reaches ground level they will build rubble basement above without doing anything extra for foundation rubble work in cement mortar of mix of 1:8 usually with cement plastering on top.If any builder or Engineer deviates from this generally accepted procedure not only the house owner but the entire people of the area will come and start abusing the person showing courage to deviate from the accepted practice.

I have faced this music and felt the heat very well when I built house at Ranni.Neither the owner nor the local people were willing to accept our procedure of rubble work for foundation.

Let us see what we do instead.

We do not dig more than 45 cm (1 1/2 feet) depth if the soil is stable.If the soil is hard laterite we do not even go down excavating more than 15 to 20 cm.We do not put p c c in stable soil to be broken by throwing of rubble pieces by rubble mason while doing foundation work.

We tell our rubble worker to closely pack rubble in dry pack method for foundation up to a height of 60 cm thereby keeping about 15 cm foundation rubble work above ground level.After this dry pack rubble foundation work,we force fill gaps of rubble work first by putting crusher sand above foundation work and then forcefully pumping water inside.As the crusher sand gets filled up inside dry packed rubble foundation,a stage will reach when no water will go down as it is fully packed with rubble and crusher sand making almost monolithic rubble foundation quite strong base for your house.

After this we build basement again by dry pack rubble work but with a slight inclination  sloping basement from 60 cm to 45 cm to a height of 45 cm for basement to add strength.We point outside of basement rubble work with mortar and plaster top of basement with a rich mix of mortar of 1:6.Inside of this rubble basement is open to receive forced filling of filling material usually red sand of powdery nature
DSC00868
DSC00870
DSC00871
DSC00877
DSC00881
DSC01935
At Ranni I had to threaten to leave the work to make my client to agree  to follow this procedure for Foundation rubble work and I have also given personal guarantee for the strength of work.Till completion of the work client and people around the area had doubts about our Foundation work.Once convinced Father of my client used to talk about others following usual procedure as fools and I used to enjoy his comments to that effect.
At Thiruvalla I was asked to leave the work due to my unwillingness to follow their  time tested or traditional method of foundation rubble work and I left the work in between rubble work.

At Chengannur,client reluctantly accepted my method of foundation rubble work.

At Cherthala and at many other places local people used to call me mad for doing this sort of foundation work and predicted that our Foundation will sink or break open.Once work progressed and nothing bad happened everybody seem to forget about their predictions.

At Kalamassery,another contractor was building his own house near my site .My client was an Engineer.Our neighbour contractor was very much critical about our foundation rubble work"without even a bag of cement".He told my client and his wife about how bad our construction is.He assured my client that our building will sink or crack or foundation will get damaged thereby causing damage to house.
My client in spite of my assurances was jittery.

Neighbour contractor has done a retaining wall in cement mortar without proper packing for his boundary wall. As I predicted retaining wall done by him has fallen apart one day and then he silently did it again as dry pack rubble work with better packing of rubble.Therafter he stopped criticising my work and started asking my client about my plans for balance work of the building.Only after that falling apart of bounday wall of neighbour,my client really started believing my words

Friday, September 25, 2009

Can anyone prepare plan for your house?

Recently I was amused to recieve an email from a client trying to build a house in a larger plot he purchased for nearly Rs.60 lakhs slightly away from Cochin in an interior location where there is hardly any houses nearby.An NRI he has taken me to the plot recently to see the plot before we go into the plan stage.

At the site he told me that he has the plan of the house ready with him.I thought he might have got it done by some other Architect and that will probably lessen my work as I may have to only modify the Plan prepared.
He returned to his work place in middle east and  sent me a single line sketch made by him and said that I should not make any change to his "Plan of the house"

This prompted me to write these lines on preparation of Plan of the house
Even though every person sees houses,not many do not bother to study more on house design or even elementary aspects of house construction.A lot of people think that house plan is something which any one can draw.Cheaper the better.
After getting any plan prepared by anyone,they ask the Architect to prepare a very good elevation for the plan as if Elevation is something totally unrelated to the Plan.I keep getting several mails asking me to do a "real good elevation" for the house with the plan forwarded.No architect has a magic wand by which he can make "good Elevation" for any Plan.

Plan is the most important document for the house construction.It gives drawing of the house when you cut the building at window level and remove upper portion and then look down from top.

While preparing a plan what I do are the following

1.Visit the plot where the house will come up and study site conditions like soil,surroundings,road access,level of the plot,directions and visualise the future house to be built with that extra insight and talent of an Architect.Many people think that just by obtaining four side dimensions of the plot an Architect can draw the plan.I am not denying this.But visiting the site and visualising or imagining the house in that plot with the extra talent and creativity of an Architect can make a lot of difference to the plan of the house.
2.Study requirement of the client in detail with detailed discussions.Guide the client on many aspects of house design and construction to obtain his views and requirement details.
3.Find out from client his budget restrictions if any.
On this point .most of the clients I have met did not want to share his financial plan for the house.Most of the prospective clients try to downsize their budget indication thinking that telling about exact financial condition may prompt me to raise my charges or cost of construction.Giving a wrong idea on your budget can create problems at plan stage as I or any other Architect will not be able to plan exactly suiting to your budget  limitations or possibilties.This may result in a house with lesser facilties  due to wrong message on your financial capabilties or facilities which you may not be able to complete fully due to lack of funds.

4.Incorporate Vasthu aspects in design

5.Use structural engineering aspects to ensure structural stabilty of the house and to reduce cost of construction.
6.Find out optimum use for every bit of building to be constructed to avoid wastage of space and to enhance utilty for space in the house.

7.Use special features of Kerala architecture and modern architecture inputs.

8.Plan to be prepared with an eye on elevation.To obtain a good Elevation Plan has to be made with that intention in mind.Elevation will be good if and only if Plan is prepared to get a good Elevation.No Architect can make a good Elevation for any Plan.

Above all lot of common sense will have to be used while preparing the Plan.Here years of experience in designing and building hundreds of houses play a vital role.
I have heard several times people telling me that he knows everything about house construction.Then I will ask him-How?
He will reply-I have constructed one or two or three houses depending on persons.

I have directly constructed more than 200 houses and designed much more.Still with each building construction,I study  several aspects which I have never noticed earlier.When the Architect has this treasure of experience,plan prepared by him can only get better.

So never try to design your house by yourself or go to less qualified less experienced person for preparation of Plan attracted by possibly lower charges.You will lose more money due to improper design and construction and when you realise the mistakes and shortcomings,it will be too late.You cannot do anything about it and you will have to live and suffer all those problems and deficiencies unless of course if you are rich enough to construct another house correcting your mistakes.

Before I conclude I should talk about another common wrong impression by prospective house building clients.Many get impressed by Plan and Elevation of houses built by others or dispayed in websites of builders.So,I keep getting mails saying that I want a house like this without even bothering to check whether that particular plan of the house will fit in his plot dimensions,requirements and above all his budget constraints.

You have to understand clearly that any plan and Elevation will not suit your plot.You have to obtain that unique plan ideally suited for your plot,requirements,budget,tastes etc.Instead of trying to become an Architect on your own, leave that job to the expert,Architect and do not forget to give him all those information on what all you need in the house including your dreams and hopes for the house.
Architect will guide you properly.
Before deciding on which Architect to choose try to understand and find out more on the works so far done by the Architect.If you feel happy about his qualifications and  experience in handling residential projects,then allow him to do the work without disturbance.

In my traditional christian family, years back it was considered great to have priests and nuns in the family circle even though of late their credibilty and status have declined a lot.When one client approached me for guidance right from selection of plot for house construction and related documentation,I thought I will be designing the house also.But when it came to preparation  of plan of the house,just as we used to proclaim about having our own priest from the family,he said relative of his wife is an Architect and naturally he will do a better job than me possibly due to relationship.
But when I saw the plan prepared I could make out several basic flaws in the plan which will ultimately turn out to be inconvineances leading to lesser utilty for space and cause for increase of cost.He was not willing to listen to my mild suggestions and insisted that the Plan is the best possible having prepared by a relative.When the construction moved on, he realised the flaws but it was too late to do anything.
The relative also gave him a three dimensional Elevation for the house.When I told him that even though picture looks good with the colours,house built like that will not look good,he simply laughed at me.But when  my prediction on deficiencies of Plan became clear to him,he told me to prepare an alternate three dimensional elevation whatever may be my charges.

Even though money is yours if you do not give the Architect proper professional freedom to decide and choose the best for you,you may not get the best work from him.After all for him it is only one of the many houses he design and build.For you it is the only house you build in your life time for you and for generations to come.Make the Architect feel good for you to make him put that element of extra care for your project.

Friday, September 18, 2009

Onam -festival of Keralites

Almost all festivals of Kerala are festivals of home coming for Keralites working outside his home town or village.Quite a lot of Keralites live in almost all countries of the world because Kerala even though rich with beautiful nature does not offer much on the economic front.
You can watch water flowing down over rocks amidst thick green forests,lakes and rivers running all over Kerala land and long beaches on one side of the state through its full length.But all these natural beauty you can enjoy during a vacation or holiday.When the money in pocket flows out you will have to move out of Kerala to fill the pockets again.
Very few Keralites are lucky enough to live and work in their home state if not necessarily in their native village or town.Others always live away from Kerala with an undying wish for living in Kerala.So festivals turn out to be family get togethers when relatives living and working in different parts of the world join at their native place.

Of all the festivals of Kerala Onam seems to be the most popular celebrated by all people of Kerala irrespective of religious divisions.Onam is celebrated using an excuse of a story possibly scripted by some one wise enough and rich in imagination.But still we Keralites would like to firmly believe just like a religious belief that the story of Onam is real and there really was a good king called Mahabali with an utopian life under his rule.
I will reproduce below a poem written by me which explains on rule of Mahabali the King and his days of happy life for all those people lived under him.
But the story says that this good King was sent to the other world called as pathalam by the real God who might have got irritated by lack of sorrow or unhappiness among human beings living under King Mahabali.If there is no sorrow and unhappiness ,who will cry for mercy of God?
But while being sentenced to pathalam,King Mahabali prayed to God to allow him to come and visit his land and people once in a year.We celebrate our greatest festival called Onam when the legendory King visit us for ten days in an year

Onam and King Mahabali

Long long back
We had this King called Mahabali
When he was ruling,
there was no sins.

No looting, no cheating
No lies, no killings
No rapes, no beatings
No double standards,
No scheming treachery.

No shortage of food
No rich and poor
No sorrows, no pain

No one was afraid of anyone
No one was doubtful about any one
No one was expecting trouble from any one

No locks and safe lockers
No jails and no police

Every one was loving and caring
Every one was helpful
Every one was there when you need help
Every one loved every one.

In our land, every year
We still celebrate ten days of festival
remembering those old days of happiness
Dreaming with no reason,
those dreamy days will come back.
Dreaming that our old King Mahabali
will come back from death
and rule us again.

with no looting, cheating
with no lies and killings
with no rapes and beatings
with no shortage of food
with no rich and poor
with no sorrows and pain.

We call those ten days
Onam festival days
Onam days of King Mahabali